This 99 page (pdf) document (current as of 2021) lists funding, short-term projects (STP), mid-range projects, long-range projects, and other data, including roadways, trails, sidewalks, etc:
2021 LMIG Road Resurfacing List

This 99 page (pdf) document (current as of 2021) lists funding, short-term projects (STP), mid-range projects, long-range projects, and other data, including roadways, trails, sidewalks, etc:
2021 LMIG Road Resurfacing List